Ongoing Projects

List of Ongoing Projects
SN.Type of CrossingCrossing Length (m) approximateNo. of Crossings (approximate)Scope of WorkLocationClient
20Sea Channel Crossing1,3001Installation of 280 mm OD , SDR 9, PE 100FujairahADNOC
19NDRC1202Supply and Installation of 6 ay 200mm HDPE pipelineMaziadAADC
18NDRC1404Supply and Installation of 9x200 + 5x110; 1x200 + 1x110;
2x200 ; 2x200 ; 6x200 ; 8x200
HDPE SDR 17 pipes
SweihanADDC
17NDRC8505Installation of 6ways(4x225 +
2X110mm SDR 17
Al DhafrahADDC
16NDRC104319Supply and Installation of 6x225mm +4X225 HDPE Pipe MV NetworkBaniyasAldar Projects
15NDRC1954Supply and Installation of 4x110mm HDPE Pipe TelecomBaniyasAldar Projects
14NDRC44.622Supply and Installation of 9x75mm HDPE pipe MCC NetworkBaniyasAldar Projects
13NDRC57.992Installation of 160 mm OD HDPE Pipe Irrigation Line (2 crossings)Shakbout CityMadon (ADDC Authority)
12NDRC51.392Installation of 280 mm OD HDPE Pipe Potable Water Line (2 crossings)Shakbout CityMadon (ADDC Authority)
11NDRC57.142Installation of 200 mm OD HDPE PipeShakbout CityAbu Dhabi Cricket
10Sea Channel Crossing2141Installation of 560 OD HDPE Pipeline Sea Channel CrossingAbu DhabiCrown Prince Court
9Long Crossing (crossings to be confirmed)to be confirmedto be confirmedInstallation of 3",4",6"8", 10"BuhasaADNOC
8Sea Channel Crossing3,9003Installation of Three Parallel Crossings (6 ways: 4-225mm_2-90mm, HDPE SDR 9) utilizing Paratrack Gyro Module
132 kV Cable Works for Hudayriyat Substation
Al Hudayriyat IslandTransco
7NDRC100.272Installation of 2x110, 2x200, 4x200, 6x200 HDPE SDR 17 by HDDAI AinAADC
6NDRC1502Installation of 1 way 560 mm, 315 mm, 1 way 160mm & 200 mm HDPE Pipe by HDD MetHDDAbu DhabiAldar Projects
5NDRC125.01 - 2 way; 125.01 - 4 way4HDD Works for installation of 1 way 160 mm, 2 way 160 mm &
4
way 160 HDPE pipe (normal &
highway crossings)
AI AinAADC
4NDRCto be confirmedto be confirmedHDD Works for installation of 2 way 75 mm and 5 way 50 mm &
1 way 75 mm and 3 way 50 mm
HDPE pipe (more than 200 crossings including highways)
AI AinMCC
3NDRC11546Installation of CS pipe by HDD method (1 x 4", 1 x 6", 1 x 8")Western Region, Abu DhabiADNOC
2NDRC3605Supply & Installation of 5 ways (4 ways 225 mm dia HDPE pipes SDR-17 + 1 way 90 mm dia HDPE pipes SDR-17) by HDD metHDD (Normal & Highway Crossings)Abu DhabiTRANSCO
1NDRC2003Installation of HDPE pipes of different sizes such as 800 mm, 710 , 630 , 560, 500 mm etc.
(Normal & Highway Crossings)
AI AinAADC